The demand factor is often implicitly averaged over time when the time period of demand is understood by the context. == Electrical engineering == This is the peak in the load profile divided by the full load of the device. Example: If a residence has equipment which would draw 6,000 W when all equipment was drawing a full load draw a maximum of 3...
Found on
http://en.wikipedia.org/wiki/Demand_factor

the ratio, expressed as a numerical value or as a percentage, of the maximum demand of an installation or a group of installations within a specified period, to the corresponding total installed load of the installation(s) NOTE - In using this term, it is necessary to specify to which level of the system it relates.